Fern Hollow Bridge

Client

Pennsylvania Department of Transportation

Services Provided

Benchmarking
Project Planning
Artist Selection
Project Management
Contract Administration

Artists

Carin Mincemoyer, Trail Meander, 2023
John Peña, 400 Million Years of Water, 2023

Project Summary

When the Fern Hollow Bridge tragically collapsed in 2022, the City of Pittsburgh and the Commonwealth of Pennsylvania agreed to task the Pennsylvania Department of Transportation (PennDOT) with leading the design and construction of a new bridge on the site. This was made possible through an emergency design-build process funded by the 2022 Bipartisan Infrastructure Law.

Through the Pittsburgh Creative Corps, Shiftworks hosted a workshop with nine Corps artists to explore opportunities to integrate artwork into the bridge’s construction. This process informed recommendations that were shared with PennDOT, and identified two locations for artwork: the pedestrian and cyclist experience crossing the bridge deck, and the trail user experience below the bridge. With those recommendations in hand, PennDOT received authorization from the federal government to commit up to 1% of the total construction budget to public art. Shiftworks was hired to facilitate artist selection and project management for the two commissions.

John Peña’s 400 Million Years of Water explores the history of water on the site. Using sandblasted words and imagery on the bridge’s concrete deck, Peña highlights periods in geological time and how water has shaped the landscape, from ancient seas to the present-day Fern Hollow Creek.

Carin Mincemoyer’s Trail Meander is located along Frick Park’s Tranquil Trail beneath the bridge. The artwork, which shapes the experience of the landscape, forms an S-curve with seating and sculptural elements resembling river boulders and driftwood. Reflecting the site’s history shaped by water, the artwork contrasts the efficient travel above with a slower, nature-focused path below.

Related

CLIENT PROJECTS

Route 28 Sound Barrier Wall

Shiftworks was hired by the Pennsylvania Department of Transportation (PennDOT) to manage artist selection and oversee the design of concrete panels of sound barrier walls as part of the Highland Park Bridge interchange reconstruction on Route 28.

Project Video

”We were contracted by the Pennsylvania Department of Transportation to apply stain and anti-graffiti coating for the reconstruction of the Fern Hollow Bridge project. As part of this scope of work, we collaborated with Shiftworks and Pittsburgh Creative Corps artist John Peña in making his designs a reality. We sandblasted and stained the stencils John designed to successfully create 400 Million Years of Water. Working with John was a great experience. He was very accommodating and helpful throughout the project. Bringing artists into the design process for major infrastructure projects such as this helps to add historical and aesthetic value to an iconic structure. Shiftworks is doing an excellent job of creating career-changing opportunities like this for artists in the region.

Jilco

About the Client

PennDOT oversees programs and policies affecting highways, urban and rural public transportation, airports, railroads, ports, and waterways. More than three-quarters of PennDOT’s annual budget is invested in Pennsylvania’s approximately 121,000 miles of state and local highways and 32,000 state and local bridges. PennDOT is directly responsible for nearly 40,000 miles of highway and roughly 25,400 bridges, a system first established in 1911. PennDOT also administers the state’s 12.1 million vehicle registrations and 10.1 million driver’s licenses and IDs, and oversees safety and emission inspection programs.

About the Artists

Carin MincemoyerCarin Mincemoyer is an artist based in Pittsburgh, PA whose work ponders the ways in which humans try to navigate the complexities of the non-human environment: appreciating, struggling to control, finding our place, seeking order. Encompassing sculpture, installation, public art, and design, her creative practice includes work in diverse materials including wood, metal, concrete, and live plants. She has been awarded public commissions in Pittsburgh, NYC, Philadelphia, and Columbia, SC, and has completed works for clients and project partners including the PA Department of Transportation, the Kennedy Center for the Performing Arts, Pittsburgh International Airport, and the Children’s Museum of Pittsburgh.

Her work has been recognized with grants and awards from the Pollock-Krasner Foundation, the International Sculpture Center and the PA Council on the Arts. Venues exhibiting her work include the Mattress Factory in Pittsburgh, PA, Grounds for Sculpture in Hamilton, NY, and SPACES in Cleveland, OH. She holds a BFA from Carnegie Mellon and an MFA from the University at Buffalo, and has held academic teaching positions at Carnegie Mellon University, Point Park University, Indiana University of PA and University at Buffalo.

John PeñaJohn Peña is a multidisciplinary artist whose work includes community-based public art, site-specific installations, and sculpture. Peña strives to create experiences that encourage a deeper examination of the natural and built environment. He does this by researching cultural, ecological, and personal histories of sites to better understand the history of both spaces and places. Peña has a wide breadth of experience in designing, budgeting, and implementing multifaceted works of public art.

In 2017, Peña began collaborating with fifteen senior residents of the Pittsburgh neighborhood of Larimer to produce a metal sign that presented their stories. The text on the sign changed every two weeks to present an unfolding narrative as told through the voices of the neighborhood’s oldest residents.

In 2023, Peña worked with Shiftworks, PennDOT, HDR, and SWANK Construction to create a site- specific artwork on the new Fern Hollow Bridge. 400 Million Years of Water consists of sandblasted water patterns etched and stained into the pedestrian sidewalk of the bridge. These patterns highlight major water events that occurred over the last 400 million years.

With all of his projects, Peña hopes to create wonder, excitement, and intrigue for the ordinary spaces of our lives.

Additional Project Support

Klavon Designs
HDR
Swank Construction
Upstream Pgh
Tree Pittsburgh
Little Kelpie
Technique Architectural Products
City of Pittsburgh
Federal Highway Administration
Deavron Dailey
Gwen Sadler
John A. Harper
Henry Prellwitz

Image credits

Gallery, top:
(1, 3, 5, 7) Carin Mincemoyer, Trail Meander, 2023

(2, 4, 6, 8, 9) John Peña, 400 Million Years of Water, 2023

All photos by Sean Carroll

Video:
MAKE ROOTS

Artist Headshots:
Ivette Spradlin

Related

CLIENT PROJECTS

Route 28 Sound Barrier Wall

Shiftworks was hired by the Pennsylvania Department of Transportation (PennDOT) to manage artist selection and oversee the design of concrete panels of sound barrier walls as part of the Highland Park Bridge interchange reconstruction on Route 28.